CLIPPER WIND TURBINE GEAR FAILURES STOP "STEELWINDS" IN LACKA...
Popularity Report
![]() |
|||
![]() |
|||
![]() |
|||
![]() |
|||
![]() |
|||
![]() |
URL Tag Cloud
- lackawanna
- , winds
- , clipper
- , upc
- , turbines
- , steel
- , wind
- , industrial
- , environment
- , ny
- , energy
Bookmark History
Saved by 1 people (0 private), first by anonymouse user on 2008-01-20
- Cwwgroup on 2008-01-20 - Tags Clipper , UPC , wind , Steel , Winds , Lackawanna , NY , Turbines , Alternative , Energy , Environment , Industrial
Public Sticky notes
The present gear problems in Lackawanna were, I believe, predictable. In my April 4, 2007 field report on Clipper’s Lackawanna installation I wrote: “My bet is that this complex gear train will have maintenance issues”. And I do not believe the present Clipper gear problems will be fixed by re-manufacturing specific gears or gear teeth or changing gear surface hardness, gear lubrication, etc, etc.
Highlighted by cwwgroup


Public Comment
on 2008-01-20 by cwwgroup